Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Bedford, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Bedford

Need a roll-off? We drop clean 20-yard or 30-yard containers in Bedford, MA with driveway boards and same-day swap-outs included.

Jobsite Roll-off Containers for General Contractors

Our construction fleet runs 20-, 30-, and 40-yard roll-offs across the Bedford metro and . Each container features reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews. We set every unit on protective driveway boards; we also offer contractor pricing and tonnage rates for recurring commercial hauling agreements on your multi-phase projects.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Bedford, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

The 20-yard roll-off measures 20 feet long by 7 feet wide and stands 4 feet tall, with about 2 tons included in the flat rate.

Our 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Bedford, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons included for your project.

This size fits whole-house remodels, additions, and new-build framing, with high walls for bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Bedford

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long by 8 feet wide and stands 8 feet tall, with about 5 tons of debris included.

Sized for commercial builds and large tear-outs, the 40-yard container functions as the largest roll-off for multi-phase jobs.

Construction Debris, Drywall, Lumber Acceptance

Our construction roll-off accepts the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. Material is sorted at the Bedford transfer station to maximize recovery — contractors on steady jobs often manage this via commercial recurring hauling agreements. You can also follow EPA construction debris recycling guidance to ensure your container is loaded correctly. Call (508) 715-8170.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Bedford, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Bedford, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials need a different container. Our reinforced-steel lowboy roll-offs handle concrete slab tear-out, brick demo, asphalt millings, and clean dirt—up to 10,000 pounds per load. The low 2-to-3-foot side walls let skid steers and wheelbarrows load over the rim without breaking USDOT truck weight limits on Bedford routes.

Heavy-debris jobs run on weight tickets from the scale house, not on the yard; the cleanest loads — with no mixed wood, drywall, or trash in them — earn the lowest per-ton rate, and the rest are billed by the tonnage that comes off the scale. I deliver the container or dumpster after talking to your site super.

Tonnage Limits and Weight Overage Policy

Every construction roll-off includes a set tonnage allowance; any extra weight is billed at our published per-ton overage rate against the scale-house ticket. Our upfront quote lists the total cap: this prevents surprises when the truck weighs in—especially for heavy loads. We recommend roofing tear-off jobsite containers for shingle projects, which ensures that dense roofing materials do not consume the included allowance for mixed debris.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

For multi-week jobs, the swap rhythm keeps things simple; text or call dispatch when a container’s full—we roll a fresh roll-off to the same staging pad the same or next business day across the Bedford metro and Massachusetts.

Step 1

Text dispatch when full

Site supers text a photo and the container number to the dispatcher—no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul your full container and drop an empty on the same pad so the crew keeps loading without losing a single hour.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; Friday afternoon coordination sets the schedule.

Insurance and Contractor Account Setup

We issue certificates of insurance to the GC or owner and run net-30 contractor accounts with consolidated monthly billing; the hooklift fleet stages recurring bins across active sites in Bedford — the account is set up in a single call with dispatch.